Time management in scientific projects: A review of the international literature (2006–2025)

Authors

DOI:

https://doi.org/10.47909/dtr.28

Keywords:

time management, Gantt chart, critical path, work breakdown structure, scientometric analysis

Abstract

In the context of project development, effective time management is paramount, as it enables the fulfillment of objectives within the stipulated timeframe while ensuring the efficient utilization of resources. However, information gaps are frequently observed, often related to the absence of data or the lack of clear methodologies for planning activities. The objective of this study is to analyze strategies that improve time management in project execution through tools such as the Gantt chart, critical path method, and work breakdown structure. A scientometric analysis of international literature from 2006 to 2025 revealed a 5.57% increase in research productivity on time management, indicating a sustained and increasing interest in the subject. Leading countries, notably China, demonstrated a substantial contribution to this production, accounting for nearly 15% of global research output and 16% of citations. This underscores the country’s significant global influence. The analysis identified high-impact journals such as the International Journal of Project Management, Engineering, Construction and Architectural Management, and Journal of Management in Engineering as major contributors to the field’s advancement. The results indicate a persistent increase in research activity in this domain and demonstrate that the amalgamation of classical methodologies with contemporary approaches enhances the efficacy of planning. In practical terms, this tool contributes to decision-making and the achievement of projects.

Downloads

Download data is not yet available.

References

Akram, M., & Habib, A. (2024). A novel Pythagorean fuzzy PERT approach to measure criticality with multi-criteria in project management problems. Granular Computing, 9(2), 1–34. https://doi.org/10.1007/s41066-024-00461-x

Al-Hashimy, H. N. H., & Yao, J. (2025). The moderating role of electronic accounting information systems in enhancing efficiency in construction project management. Engineering, Construction and Architectural Management. Ahead-of-print. https://doi.org/10.1108/ECAM-08-2024-1081

Aliahmad, M., Miri, M., & Rashki, M. (2025). Sequential space conversion method with multi-armed bandit algorithm for time-variant reliability and dynamic project management. Reliability Engineering & System Safety, 265, Article 111540. https://doi.org/10.1016/j.ress.2025.111540

Bajaria, P., Bangad, S., Mahadik, S., & Wankhede, S. (2025). Integrating data analytics into project management. In A. Joshi, R. Ragel, M. Mahmud, & S. Kartik (Eds.), ICT: Applications and Social Interfaces (pp. 317–327). Springer Nature Singapore. https://doi.org/10.1007/978-981-96-5751-3_27

Ballesteros-Pérez, P., Larsen, G. D., & González-Cruz, M. C. (2018). Do projects really end late? On the shortcomings of the classical scheduling techniques. Journal of Technology and Science Education, 8(1), 17–33. https://doi.org/10.3926/jotse.303

Botero, M. R., Pedrozo, M. A. M., Vega, H. D. M., & Torres-Rumbo, D. E. (2025). Microplastics in the ocean: Scientometric analysis of the scientific literature. Interfaces, 8(2).

Cui, Y., Hong, F., Kitahara, M., & Wei, P. (2025). Time-variant reliability analysis using stratified beta-sphere sampling and active learning. Reliability Engineering & System Safety, 264, Article 111295. https://doi.org/10.1016/j.ress.2025.111295

Datta, S. D., Sobuz, M. H. R., Mim, N. J., & Nath, A. D. (2023). Investigation on the effectiveness of using building information modeling (BIM) tools in project management: A case study. Revista de La Construcción. Journal of Construction, 22(2), 306–320. https://doi.org/10.7764/RDLC.22.2.306

de Barros, M. C., Brembatti, K. V., Neto, J. M. R., Ferreira, T. L., & Figueiredo, R. S. D. (2025). Project management: From individual control to the world of AI. Offshore Technology Conference (OTC) 2025, D022S059R011. Houston, Texas, USA.: Petrobras. https://doi.org/10.4043/35786-MS

Demirkesen, S., & Ozorhon, B. (2017). Measuring project management performance: Case of construction industry. Engineering Management Journal, 29(4), 258–277. https://doi.org/10.1080/10429247.2017.1380579

Díez, D., Díaz-Ospina, J., Robledo, S., & del Pilar Rodríguez-Córdoba, M. (2022). Tendencias teóricas y desafíos en la comunicación de la responsabilidad social corporativa. Anagramas Rumbos y Sentidos de la Comunicación, 20(40), 146–176. https://doi.org/10.22395/angr.v20n40a7

Ehsani, E., Kazemi, N., Olugu, E. U., Grosse, E. H., & Schwindl, K. (2017). Applying fuzzy multi-objective linear programming to a project management decision with nonlinear fuzzy membership functions. Neural Computing & Applications, 28(8), 2193–2206. https://doi.org/10.1007/s00521-015-2160-0

Fernandes, G., Tassari, G., Rocha, L., Ferreira, L. M. D. F., Santos, J. M. R. C. A., Ribeiro, P., Barroso, D., & Pinto, E. B. (2024). Useful project management practices in collaborative R&D&I projects. Procedia Computer Science, 239, 1062–1069. https://doi.org/10.1016/j.procs.2024.06.270

Fernandes, G., Ward, S., & Araújo, M. (2014). Developing a framework for embedding useful project management improvement initiatives in organizations. Project Management Journal, 45(4), 81–108. https://doi.org/10.1002/pmj.21441

Gómez, J. S. S., Herrera, E. A. A., & Puentes, C. C. T. (2025). Business intelligence for decision-making in royalties project management. Transactions on Energy Systems and Engineering Applications, 6(1), 1–25. https://doi.org/10.32397/tesea.vol6.n1.718

Habibi, F., Taghipour Birgani, O., Koppelaar, H., & Radenović, S. (2018). Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT). Journal of Project Management, 3(4), 183–196. https://doi.org/10.5267/j.jpm.2018.4.002

Hincapié-Naranjo, L., Torres-Sarria, S., Castro-Peña, M. Y., & Vásquez-Hernández, J. E. (2024). Theoretical-conceptual approach to inclusive marketing: a perspective from sensory disabilities. Clío América, 18(35), 126–139. https://doi.org/10.21676/23897848.5674

Hu, Y., Chan, A. P. C., Le, Y., & Jin, R.-Z. (2015). From construction megaproject management to complex project management: Bibliographic analysis. Journal of Management in Engineering, 31(4), Article 04014052. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000254

Kyriklidis, C., & Dounias, G. (2023). A ship-construction dataset for resource leveling optimization in large project management problems. Data in Brief, 49, Article 109340. https://doi.org/10.1016/j.dib.2023.109340

Li, D., Han, D., Xia, B., Weng, T.-H., Castiglione, A., & Li, K.-C. (2022). Fabric-GC: A Blockchain-based Gantt chart system for cross-organizational project management. Computer Science and Information Systems, 19(3), 1213–1240. https://doi.org/10.2298/csis211105024l

Martínez-Pinzón, C. A., & Duque-Hurtado, P. L. (2024). Scientometric insights into dynamic capabilities: Measuring academic impact and trends. Clío América, 18(35). https://doi.org/10.21676/23897848.5816

Mejia-Rosado, O. A., Fragozo, A. C. P., Fragozo, A. C. P., & Bayona, G. J. O. (2025). Agricultura en ambientes controlados, técnicas de control y su relación con la extracción de aceites esenciales: un análisis cienciométrico. Interfaces, 8(1).

Nguyen, L. D., Chih, Y.-Y., & García de Soto, B. (2017). Knowledge areas delivered in project management programs: Exploratory study. Journal of Management in Engineering, 33(1), Article 04016025. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000473

Odedairo, B. O. (2024). Assessing the influence of various work breakdown structures on project completion time. Engineering, Technology & Applied Science Research, 14(2), 13773–13779. https://doi.org/10.48084/etasr.7023

Ouda, E., & Hussein, I. (2025). Housing project management by using fully fuzzy critical path problem. International Journal of Mathematics and Computer Science, 20(1), 373–381. https://doi.org/10.69793/ijmcs/01.2025/emanouda

Robledo, S., Arias, B., García, C., Durley-Torres, I., & Zuluaga, M. (2024a). Margaret: Streamlining research productivity analysis in Colombia with an R package for GrupLAC integration. Issues in Science and Technology Librarianship, (108). https://doi.org/10.29173/istl2777

Robledo, S., Gil-Silva, D.-C., Villegas-Jaramillo, E.-J., & Osorio, C. (2025). Examining the role of monetary incentives and tie strength in mediating satisfaction and word of mouth in multilevel marketing companies: An entrepreneurial marketing perspective. Journal of Research in Marketing and Entrepreneurship, 27(3), 338–362. https://doi.org/10.1108/jrme-07-2023-0117

Robledo, S., Valencia, L., Zuluaga, M., Echeverri, O. A., & Valencia, J. W. A. (2024b). tosr: Create the tree of science from WoS and Scopus. Journal of Scientometric Research, 13(2), 459–465. https://doi.org/10.5530/jscires.13.2.36

Serrador, P., & Pinto, J. K. (2015). Does Agile work? A quantitative analysis of agile project success. International Journal of Project Management, 33(5), 1040–1051. https://doi.org/10.1016/j.ijproman.2015.01.006

Shen, F., Roccosalvo, J., Zhang, J., Tian, Y., & Yi, Y. (2023). Online technological STEM education project management. Education and Information Technologies, 28(10), 12715–12735. https://doi.org/10.1007/s10639-022-11521-7

Shulong, W., Yin, Z., & Shubin, W. (2025). Digitalization of construction project management based on digital twins. In 2025 3rd International Conference on Integrated Circuits and Communication Systems (ICICACS 2025), 811–816. Piscataway, NJ, USA (IEEE Service Center): Institute of Electrical and Electronics Engineers (IEEE). https://doi.org/10.1109/ICICACS65178.2025.10968142

Suresh, D., & Annamalai, S. (2024). Effect of schedule management plan in project management worth using structural equation modelling. Anais Da Academia Brasileira de Ciências, 96(2), Article e20230117. https://doi.org/10.1590/0001-3765202420230117

Tereso, A., Ribeiro, P., Fernandes, G., Loureiro, I., & Ferreira, M. (2019). Project management practices in private organizations. Project Management Journal, 50(1), 6–22. https://doi.org/10.1177/8756972818810966

Torres, G., Rojas-Berrio, S. P., Duque-Uribe, V., & Robledo, S. (2024). Building sales through connections: How network capabilities and tie strength foster entrepreneurial marketing. Journal of Research in Marketing and Entrepreneurship, 26(4), 690–715. https://doi.org/10.1108/jrme-08-2023-0141

Ojiako, U., Ashleigh, M., Chipulu, M., & Maguire, S. (2011). Learning and teaching challenges in project management. International Journal of Project Management, 29(3), 268–278. https://doi.org/10.1016/j.ijproman.2010.03.008

Valencia, S., Zuluaga, M., Florian Pérez, M. C., Montoya-Quintero, K. F., Candamil-Cortés, M. S., & Robledo, S. (2025). Human gut microbiome: A connecting organ between nutrition, metabolism, and health. International Journal of Molecular Sciences, 26(9), 4112. https://doi.org/10.3390/ijms26094112

Zhang, D., & Chen, R. (2025). Decision support system for engineering project management based on data mining. In S. Patnaik, M. Tavana, & V. Jain (Eds.), New Paradigms in Big Data Technology and Business Analytics (pp. 363–373). Springer Nature Switzerland AG. https://doi.org/10.1007/978-3-031-96653-8_33

Zhu, X., Li, H., & Su, T. (2023). Autonomous complex knowledge mining and graph representation through natural language processing and transfer learning. Automation in Construction, 155, Article 105074. https://doi.org/10.1016/j.autcon.2023.105074

Downloads

Published

02-02-2026

Data Availability Statement

The datasets generated and/or analyzed during this study are available from the corresponding author upon reasonable request, subject to applicable data use restrictions.

Issue

Section

Review articles

How to Cite

Gutierrez, I., Romero, L., & Romero, D. (2026). Time management in scientific projects: A review of the international literature (2006–2025). DecisionTech Review, 6(1), 1-14. https://doi.org/10.47909/dtr.28